What is ARDEX FEATHER FINISH used for?

What is ARDEX FEATHER FINISH used for?

ARDEX FEATHER FINISH is an ultra rapid drying patching and smoothing compound, which provides a high bond strength to concrete, plywood, sand/cement screeds, existing smoothing compounds and ceramic tiles, without the need to prime.

What is ardex k15 used for?

ARDEX K 15 is used to level and smooth interior concrete, terrazzo, ceramic and quarry tile, epoxy coating systems, metal, wood substrates and non-water soluble adhesive residue on concrete prior to the installation of finished flooring – on, above or below grade.

Is Henry feather finish the same as ARDEX FEATHER FINISH?

The Henry Feather Finish is the same stuff as is in this Ardex bag. They are made by the exact same company -just different packaging. I found the Henry at Home Depot. You just have to search because different territories in the US carry different products and brands.

How thick can you pour ardex?

2″

ARDEX K 521™ is a pourable, polishable, self-leveling topping for fast-track resurfacing of indoor concrete. ARDEX K 521 can be installed from a minimum thickness of 3/8″ (9 mm) up to a maximum thickness of 2″ (5 cm).

Does feather finish need primer?

NON-POROUS SUBSTRATES: ARDEX FEATHER FINISH will bond to some non-porous substrates, such as burnished concrete, terrazzo, and ceramic and quarry tile, without the use of a primer.

Can Feather Finish be sanded?

A light sanding should do if you applied it smoothly. The final coat when dry should be sanded as smooth as possible before putting on color or sealant. I would allow 1 day between coats. Ardex Feather Finish dries really fast, but better to give it 24 hours to be sure.

Can you epoxy over ardex feather finish?

OTHER NON-POROUS SUBSTRATES: ARDEX FEATHER FINISH also can be applied over other clean, sound and solidly bonded non-porous substrates, including terrazzo, burnished concrete, epoxy coating systems, and ceramic and quarry tile.

How long does ardex take to cure?

Installing ARDEX products over “green” concrete will result in the cracks telegraphing through the ARDEX layer as they develop in the concrete. To avoid this, allow the concrete to cure a minimum of 28 days, and repair any cracks before proceeding with the installation of the ARDEX material.

Can you feather finish over tile?

Smooth Over Tiles & Grout with ARDEX Feather Finish – YouTube

Can you sand down ardex?

Yes. You should sand before applying each coat. A light sanding should do if you applied it smoothly. The final coat when dry should be sanded as smooth as possible before putting on color or sealant.

Can I use ardex on wood?

ARDEX Liquid BackerBoard is also suitable for the installation of engineered wood plank and laminate floor coverings and for encapsulating in-floor electrical heating systems.

How long does it take ardex to cure?

ARDEX HC 100R is walkable 2 to 3 hours after installation. Allow a 6-hour cure for moisture-insensitve tile, such as ceramic, quarry and porcelain, and a 16-hour cure for all other floor coverings. Drying time is a function of jobsite temperature and humidity conditions, as well as the installation thickness.

Can you use ardex on wood?

Does ardex need a primer?

Can you put SpreadStone over tile countertop?

Existing countertops made of laminate, cultured marble, concrete, wood, tile and other solid surfaces all effortlessly accept the SpreadStone finish. Just roll on a new stone surface — right over an existing kitchen or bathroom countertop — in just a weekend.

Can I tile over ardex feather finish?

ardexamericas.com. As soon as the ARDEX FEATHER FINISH can be worked on without damaging the surface (15-20 minutes), standard floor coverings such as ceramic tile, VCT, sheet vinyl and carpeting can be installed.

Can you use ardex on plywood?

ARDEX TL WOOD™ is a self-leveling underlayment used to smooth uneven, structurally sound plywood, OSB, and strip wood flooring without the use of metal lath. Ceramic tile can be installed in 48 hours and other floor coverings in 2-3 days.

Can you use self leveler over plywood?

If you’ve got a plywood subfloor, like many buildings do, you can leave it in place and apply self-leveling concrete directly on top of it. Once the plywood subfloor is covered, just apply the finish you want to achieve the desired look.

Is ardex feather finish toxic?

Hazard Statements
Causes skin irritation. Causes serious eye damage. May cause cancer by inhalation. Causes damage to lungs through prolonged or repeated inhalation.

Can you use ARDEX FEATHER FINISH on plywood?

Quickly Smooth Plywood Floors In 15 mins with ARDEX Feather Finish

Can you pour self-leveling concrete over tile?

Self-levelling concrete is a polymer-modified cement that has high flow characteristics, it’s used in the preparation of laying most floor coverings to create a smooth and level surface. Levelling compound can be used on a variety of substrates including concrete, screed, existing tiles, and timber floors.

How much does a 50 lb bag of self leveler cover?

approximately 40 Sq. Ft.
Coverage: One 50 Lb. bag will cover approximately 40 Sq. Ft. at 1/8 In.

How thick can you pour self leveler?

How Thick Can You Pour Self Leveling Concrete? The thickness depends on the product you use. But standard thicknesses are between ⅛ inch and 1 inch. However, there are mixes that can be poured as thin as 1/16 inch and as thick as 5 inches.

Does self leveling concrete crack?

A DIY self-levelling cement job might look good for a few months, maybe even a couple years. But if it’s not done properly, eventually it can start to crack.

Do I need to prime floor before self levelling?

Self-leveling underlayments require the use of a primer prior to installation (like the TEC Multipurpose Primer). Failure to use product recommended primer may result in installation failure. Primer retains the moisture within the self-leveling underlayment to allow proper curing.