What is PPK formula?

What is PPK formula?

Ppk can be determined by diving the Z score by three. A z score is the same as a standard score; the number of standard deviations above the mean. Z = x – mean of the population / standard deviation. Ppk = ( USL – µ) / 3σ = z / 3.

How do you calculate Cpk and PPK in Excel?

So what are you gonna do we cannot simply calculate equals. Ever SD DV dot s that will give you the sample standard deviation and select all these data points like that.

What is Cpk and PPK calculation?

If we look at the formulas for Cpk and Ppk for normal (distribution) process capability, we can see they are nearly identical: The only difference lies in the denominator for the Upper and Lower statistics: Cpk is calculated using the WITHIN standard deviation, while Ppk uses the OVERALL standard deviation.

What is Cpk formula?

The formula for the calculation of Cpk is Cpk = min(USL – μ, μ – LSL) / (3σ) where USL and LSL are the upper and lower specification limits, respectively. A process with a Cpk of 2.0 is considered excellent, while one with a Cpk of 1.33 is considered adequate.

What is good PPK value?

For stable processes and normally distributed data, a Cpk value ≥ 1.33 should be achieved. For chronically unstable processes with output meeting specification and a predictable pattern, a Ppk value ≥ 1.67 should be achieved.”

What is PPK value?

Ppk. Ppk is a measure of the overall capability of the process and equals the minimum of PPU and PPL. Ppk is a ratio that compares two values: The distance from the process mean to the closest specification limit (USL or LSL) The one-sided spread of the process (the 3-σ variation) based on its overall variation.

What is a good PPK value?

What does a Cpk of 1.67 mean?

Excellent, Capable

CPK >1.67 (Excellent, Capable)

What is the formula for Cpk in Excel?

What is the formula of Cp & Cpk? Cp= ((USL-LSL)/ (6 x Standard Deviation)) , where USL=Upper Specification Limit & LSL=Lower Specification Limit.

What if PPK is less than 1?

If Ppk is 1.0, the system is producing 99.73% of its output within specifications. The larger the Ppk, the less the variation between process output and specifications. If Ppk is between 0 and 1.0, not all process output meets specifications.

What sigma is 1.33 Cpk?

4.0
Sigma level table

Two sided table
Cpk Ppk Sigma level % out of tolerance
1.00 3.0 0.27
1.17 3.5 0.05
1.33 4.0 0.01

What is the difference between PPK and Cpk?

So the key takeaway is that Cpk is the potential of a process to meet a specification (short term) while Ppk is how the process actually did (long term). Another way to look at the difference is that Cpk is used for a subgroup of data, while Ppk is used for the whole process.

What is Cp and Cpk value?

The Cp and Cpk indices are the primary capability indices. Cp shows whether the distribution can potentially fit inside the specification, while Cpk shows whether the overall average is centrally located. If the overall average is in the center of the specification, the Cp and Cpk values will be the same.

How many sigma is 1.67 Cpk?

5.0
Sigma level table

Two sided table
Cpk Ppk Sigma level % out of tolerance
1.67 5.0 0.0001
1.83 5.5 0.000004
2.00 6.0 0.0000002

What does Cpk 1.67 mean?

The Capability Index, Cpk.
The outcome of a Process Capability study is a single metric, which provides an indication of the ability of a process to consistently provide output which is within required specifications. CPK <1.00 (Poor, incapable) 1.00< CPK <1.67 (Fair) CPK >1.67 (Excellent, Capable)

What Cpk is 3 sigma?

Relationship to measures of process fallout

Cp Sigma level (σ) Process yield
1.00 3 99.73%
1.33 4 99.99%
1.67 5 99.9999%
2.00 6 99.9999998%

What does 1.67 PPK mean?

Interpretation. Pp and Ppk > 1.67 The process probably meets customer requirements. After approval, begin production and follow the Approved Control plan. 1.33 ≤ Ppk ≤ 1.67 The process may not meet customer requirements.

How many ppm is 1.33 Cpk?

63.342
Sigma level table

Two sided table
Cpk Ppk Sigma level PPM out of tolerance
1.33 4.0 63.342
1.50 4.5 6.795
1.67 5.0 0.573

Whats a good PPK value?

According to Six Sigma philosophy, Cp or Pp and Cpk or Ppk should be greater than 1.50. From a technical standpoint, Six Sigma deems a process being acceptable only after achieving a maximum defect rate of 3.4 parts per million opportunities.

What is a good PPK and Cpk?

When the Cpk calculation is a high number (general industry guideline is 1.66 or higher), then it is a good indication the process is statistically in control. If the Cpk and Ppk calculations are very close or equal, then there is an even better indication that the process is statically in control.

What does a PPK of 1.67 mean?

Related Post