Costs Per Linear Foot to Build a Trench

Trenching Cost Range Average Cost
Equipment (Trencher) $1.75 – $2.50 $2.12
Labor* $2.25 – $9.50 $5.87
Total Per Linear Foot $4 – $12 $8
Total Per 100 Linear Feet $400 – $1,200 $800

What is Trench Shoring Company?

Trench Shoring Company provides the construction industry with the finest in shoring equipment, trench plates and services starting with consultation before you begin excavation. Whether it’s a small utility trench or a 10-mile sewer line, Trench Shoring Company has the equipment to meet your needs.

At what depth does OSHA require shoring?

5 feet

Trenches 5 feet (1.5 meters) deep or greater require a protective system unless the excavation is made entirely in stable rock. If less than 5 feet deep, a competent person may determine that a protective system is not required.

Can you use plywood for shoring?

Desler at the American Plywood Association dated April 15, 1992 indicates that OSHA will now accept the use of two layers of 3/4 inch thick plywood to hold back local raveling when used with vertical aluminum hydraulic shores.

How long does it take to trench 100 feet?

The short answer is a good working trencher of 100 linear feet will take roughly 12 hours to dig. You can calculate the work period by multiplying the linear feet you need to dig by 0.12. However, how fast you finish depends largely on the trencher power and the soil environment.

Is directional drilling cheaper than trenching?

Advantages of Trenching
Perhaps the biggest advantage of traditional trenching is that it’s significantly cheaper than directional boring so long as your property is relatively open.

What is a shoring company?

Shoring Equipment – Take it from the Top
Trench Shoring Company provides the construction industry with the finest in underground shoring equipment, trench plates, trench and manhole boxes, aluminum hydraulic shores, and more.

How much does hydraulic shoring cost?

With a starter set consisting of two shores, a pump can, a release tool, and a release hook, shoring systems range in price from $1550 to $2400. Much more cost-efficient than other solutions, they’re also more efficient in the field.

When a trench is 4 feet or more in depth?

In trenches that are 4 feet or more in depth, provide a means of access and egress. Spacing between ladders, stairs or ramps should not be more than 50 feet. No worker should have to travel more than 25 feet laterally to reach a means of egress (exit). Ladders must be secured and extend 36 inches above the landing.

What is the 1 2 depth RULE?

Any system used must meet the required performance criteria. than 1½:1 (for every foot of depth, the trench must be excavated back 1½ feet). A slope of this gradation is safe for any type of soil. a registered professional engineer.

What type of wood is best for shoring systems?

Specific wood is required for use in a timber shoring system. Oak with a bending strength of 850 psi and Douglas fir with a bending strength of 1500 psi are specifically mentioned in the Standard.

Is a trench box and a trench shield the same thing?

What’s the difference between a trench box, shore box and a trench shield? Nothing. They are all terms used to refer to the same common type of trench protective system. A trench box, or trench shield, protects the workers inside it in the event of a trench wall collapse.

What is the fastest way to dig a trench?

What is the Fastest Way to Dig a Trench by Hand? A specially designed trenching shovel is the quickest tool for the job if you are digging a trench by hand. These shovels have sharp tips and long heads. This allows you to easily excavate to the right width and depth with a single scoop.

How many feet can you trench in a day?

Trencher Production
“Our customers look to dig 1 to 2 miles of trench per day,” says Kevin Shimp, president of Port Industries, a trencher manufacturer in Palmyra, MO. “That’s one trench with one operator, opening up 10,000 feet of trench per day, whereas one excavator can open up 1,000 to 1,500 feet per day.

How expensive is directional boring?

3.1 Construction Cost

Service/Product Price-Low Unit
Directional Boring – Rural $6.00 Foot
Directional Boring – Urban $8.00 Foot
Directional Boring – Rock $42.50 Foot
Conduit (2” HDPE) $0.75 Foot

How do you dig a trench for electrical wiring?

The Easiest Way to Bury Cable Or Wire Underground – YouTube

What is the most common type of shoring?

H or I-Beam Shoring also known as soldier pile walls are the most common type of shoring that we usually encountered in a construction project. It is constructed by driving prefabricated steel I or H sections into the ground.

What are the different types of shoring?

Here are several different shoring types that construction professionals use:

  • H and I-beam shoring.
  • Secant pile shoring.
  • Contiguous pile shoring.
  • Sheet piles.
  • Diaphragm walls.
  • Raking shoring.
  • Hydraulic shoring.
  • Soil nail shoring.

How do you slope a trench?

The OSHA guidelines for trench sloping are generally pretty simple: for trenches less than 20 feet in depth, the slope needs to be cut back to 1.5 times wider than the depth of the trench. However, it can get much more complicated from there. Trenches over 20 feet in depth, require a licensed engineer.

What are the different types of shoring for excavation?

Different types of shoring

  • H and I-beam shoring. H and I-beam shoring, also known as soldier pile walls, supports excavation endeavors that have a depth of 50 inches to 200 inches.
  • Secant pile shoring.
  • Contiguous pile shoring.
  • Sheet piles.
  • Diaphragm walls.
  • Raking shoring.
  • Hydraulic shoring.
  • Soil nail shoring.

How deep can an excavation be without shoring?

How Deep Can a Trench Be Without Shoring? Trenches with a depth of 5 feet (1.5 meters) or greater need a protective system unless the entire excavation is in stable rock. If there is anything less than 5 feet, it is up to a competent person’s discretion to determine if there is a need for a protective system.

What type of soil can shoring be used with?

Manufacturers of shoring equipment have promoted and use in their tabulated data an intermediate Type C-60 soil classification that in the hierarchy falls between Type B and Type C soils. This category is generally accepted within the shoring industry by contractors and those reviewing worker protection plans.

What is the proper slope for a trench?

All simple slope excavations 20 feet or less in depth shall have a maximum allowable slope of 1:1.

TABLE B-1. MAXIMUM ALLOWABLE SLOPES.

SOIL OR ROCK TYPE MAXIMUM ALLOWABLE SLOPES (H:V)(1) FOR EXCAVATIONS LESS THAN 20 FEET DEEP(3)
STABLE ROCK TYPE A (2) TYPE B TYPE C VERTICAL (90º) 3/4:1 (53º) 1:1 (45º) 1 ½:1 (34º)

Can trench boxes be stacked?

As trenches get deeper, trench boxes can be stacked on top of one another to provide the necessary protection for workers. Each trench box must be designed to resist the pressure of the earth at the level where it’s being used.

How high should a trench box be above ground?

18 inches
Specifically, the trench shield extends 18 inches (0.45 m) above the vertical part of the walls, but is below the top of the trench. Therefore, where the top of the shield is below grade, it must extend a minimum of 18 inches above the vertical part of the wall.