What is a construction work package?
A construction work package (CWP) is a unit of the first level of a project’s scope breakdown. It defines a logical and manageable division of work within the construction scope. An engineering work package (EWP) is an engineering and procurement deliverable that is used to form Construction Work Packages (CWP).
What is a work package example?
An example of a work package is in the construction industry, where different teams contribute to the project’s completion. Each team is assigned duties, and they have deadlines to meet.
How do I create a work package?
How to Create an Effective Work Package
- Don’t over decompose. To figure out an appropriate work package size, try the 8/80 rule, which states that a work package shouldn’t take less than eight hours to complete or more than 80 hours.
- Keep estimates in mind.
- Assign responsibility.
- Make it unique.
What are the contents of a work package?
The work package description is the logical continuation of the work breakdown structure. In the work breakdown structure (WBS), the WBS code, name, dates, responsibility and progress of the work packages are defined and displayed.
What are the key characteristics of a work package?
A work package is generally decided on due to the following characteristics they have in common:
- Nature of work involved (e.g. marketing, programming, etc.)
- Outcomes of the tasks.
- Geographical location where tasks take place.
- Time when tasks will be completed.
- Technology or materials that will be used.
What is a work package level?
The work package level is the lowest level of a work breakdown structure (WBS). The WBS is developed during the “Create WBS” planning / scope process. The WBS level is achieved when the work can be accurately estimated (both cost and duration) and can be managed by one individual: the work package owner.
What is the difference between a WBS and a work package?
WBS is an important component of scope baseline.
…
Work Package | Planning Package |
---|---|
It’s a lowest level element of work breakdown structure, further decomposition will not be done beyond this level | It’s also a lowest element at a given point of time but at later stage it will get decomposed into work packages |
What are the 3 levels of work breakdown structure?
Most work breakdown structures have 3 levels that represent the project’s main deliverable, control accounts, project deliverables and work packages.
Who is responsible for the work package?
Completion of a work package is most often overseen by a specific person: a manager, supervisor, a team lead, or a designated team member.
What is the difference between a deliverable and a work package?
A deliverable is a tangible outcome that gives satisfaction to one or more project stakeholders. Work packages are smallest deliverable in a project. They reside at the lowest level of a WBS.
What is the difference between work packages and activities?
The work package is usually the lowest component or level of the deliverable in a given project. It is derived from the complete breakdown of the WBS. On the other hand, the activity is a means to create a deliverable. Several activities give rise to a work package, which is the lowest level of a deliverable.
What are the 5 types of WBS?
Most WBS charts have 3 levels, but you can add more depending on the complexity of your projects. Each of those five project phases—initiation, planning, execution, control and closeout, also act as control accounts and branch off the main deliverable at the top.
What is the 8 80 rule in project management?
Another good measure is the “8 – 80” rule, which recommends that the lowest level of work should be no less than 8 hours and no more than 80 hours. Level of detail for work packets should be documented in the WBS Dictionary or the Project Management Plan.
What is 100 rule in project management?
The 100% rule states that the WBS includes 100% of the work defined by the project scope and captures all deliverables – internal, external, interim – in terms of the work to be completed, including project management.
What is 100% rule in work breakdown structure?
What are the 4 WBS levels?
The four WBS levels you can implement in your organization are:
- The top level. The top level of a WBS states the project’s title and the final deliverable.
- Controls account. Next, list the controls account WBS level underneath the top level.
- Work packages.
- Activities.