What is plenum in mechanical?

What is plenum in mechanical?

A space lying above the ceiling in a building but below the next floor, especially one allowing movement of air between parts of the building.

How long is supply plenum?

Single plenums should not exceed 24 ft in length. Double plenums should not exceed 48 ft in total length.

What is minimum plenum height?

(50 mm) for the thickness of a suspended ceiling,we see that a minimum height of about 18 in. (460 188 mm), and preferably 20 in. (500 mm), must be added to the thickness of the floor structure and fire-proofing in a typical building to allow for mechanical and electrical services.

Can you have PVC in plenum rated ceiling?

The world’s first engineered PVC DWV system rated for high buildings and plenums. Contractors installing DWV pipe in high buildings and plenums had few alternatives to heavy cast iron and copper. IPEX has changed that.

What is the purpose of plenum cable?

plenum cable. Cable that is run in the plenum spaces of buildings. In building construction, the plenum (pronounced PLEH-nuhm) is the space that is used for air circulation in heating and air conditioning systems, typically between the structural ceiling and the suspended ceiling or under a raised floor. Additionally, what is plenum and what must you do to be able to run cable through plenum space?

How to choose between plenum vs riser rated cables?

– CMP: Communications Plenum. It can be installed in any space. – CMR: Communications Riser – CATVP: Cable TV Plenum. – CATVR: Cable TV Riser – CL3P: Class 3 Plenum. Usually for in-wall installation in plenum, riser and general spaces. – CL2P: Class 2 Plenum. Usually for in-wall installation in plenum, riser and general spaces. – CL3R: Class 3 Riser. – CL2R: Class 2 Riser.

How to build a plenum box 44671?

Set a piece of duct board on a firm surface with the foil vapor barrier sitting on the work surface.

  • Mark the duct board. Pull the tape measure along the piece of duct board.
  • Lay the duct board knife flat between the duct board and the foil vapor barrier with the tip of the knife pointing toward the 1-1/2-inch line.